Félix Giorgetti has built its third, 24,000m2 Data Centre in Betzdorf for Luxembourg’s P&T.

The earthworks, steel frame shell construction and sealing works were carried out in accordance with rigorous technical specifications. Façades were built using exposed concrete.

This ambitious project was completed in just 11 months.
Construction period
2010-2012
Locality
Betzdorf
Facts & Figures

Earthworks: 125,000m3

In-situ concrete: 26,000m3

Building volume: 180,000m3

Surface area: 24,000m2

Wall formwork: 60,000m2