
Description
The work of the fifth extension of the Court of Justice, of which Félix Giorgetti does the structural work, started in September 2016.
The façades are made in association with the Swiss company "Félix Constructions". The building consists of a basement (level-2 to level + 2) and a tower of 125 linear meters (level-2 to level +30).