Dexia Bil Offices
Esch-sur-Alzette
Concrete: 36,000m3
Framework: 4,250 tonnes
Steel frame: 2,200 tonnes
Formwork: 158,500m2
Félix Giorgetti built the shell of this administrative building on industrial wasteland in Esch/Belval.
The atrium’s glass structure was made using a three-dimensional steel frame.