Félix Giorgetti took part in the building of this administrative complex on industrial wasteland at Esch/Belval. The work included:
  • earthworks: 110,000m3
  • infrastructures with 4 underground levels for car parks and technical rooms: 36,000m2
  • superstructures with buildings A (19 floors), B and C (9 floors) with a total floor area of 34,500m2
With a mixed supporting structure:
  • Concrete: 36,000m3
  • Framework: 4,250 tonnes
  • Steel frame: 2,200 tonnes
  • Formwork: 158,500m2

The atrium’s glass structure was made using a three-dimensional steel frame.