Lot 2
covered section
Lot 2: cut-and cover tunnel of 140 meters
Lot 3: overpass of 444 meters
Lot 4: motorway section of 2100 eters
The bypass works include the construction of a cut-and-cover tunnel, several motorway sections and a viaduct.
Félix Giorgetti won tenders for 3 of these lots :The opening of the bypass took place in September 2015 .