Junglinster bypass Lot 2, Lot 3, Lot 4 à JUNGLINSTER

Junglinster bypass Lot 2, Lot 3, Lot 4 à JUNGLINSTER

Description

Junglinster a village of  6500 citizens profits from a new bypass to divert traffic and ease traffic congestion in the center of the city.

The bypass works include the construction of a cut-and-cover tunnel, several motorway sections and a viaduct.

Félix Giorgetti won tenders for 3 of these lots :
Lot 2 a reinforced concrete cut-and-cover tunnel of 140 meters long (15x5m section ) below the existing road.
Lot 3 a viaduct of 444 meters
Lot 4 a new motorway section of 2100 meters

The opening of the bypass took place in September 2015 .

 

Construction period
2011-2015
Facts & Figures
Lot 2:  cut-and cover tunnel of 140 meters

Lot 3: overpass of 444 meters

Lot 4: motorway section of 2100 eters

Contact us :

 + 352 49 88 88