
Description
Responsible for extension and renovation works over several stages, Félix Giorgetti was faced with a sizeable logistical challenge. All work had to be carried out alongside the day-to-day operations of the shopping centre.
The first extension, in the “Home” area, was completed in 1995. The total floor area of this extension is around 10,000m2. Between 2000 and 2001, Félix Giorgetti built the customer car park (Parkhouse), which provides 800 parking spaces.
The last and currently ongoing construction phase involves building the shell of the shopping centre extension and designing the external layout. This work began in 2010 and is scheduled for completion in May 2013.