With a length of 4,000 metres and a width of 60 metres, the runway is renovated in sections and only at night.
At 29-31 and 49-51 Avenue de la Gare in Luxembourg-City, Félix Giorgetti is blending past and present
Félix Giorgetti, in a consortium with Karp-Kneip Constructions, built for lux-Airport a new checkpoint as part of the rehabilitation work on the Findel runway.
Félix Giorgetti built a second tunnel alongside the existing Rangwee tunnel.
Covering an area of 16.6ha, it is the largest park and the green lung of the Luxembourg capital.
Facilitate mobility in the capital with a 2,000 parking in the new Cloche d'Or district.
Enhance CFL maintenance capacities
In Wickrange, route des Trois Cantons, Félix Giorgetti is building a mixed-use project of approximately 90,000 m² which extends over more than 3 ha.
Six years after the delivery of its logistics hall on the Eurohub site, Transalliance has commissioned Félix Giorgetti to build a 20,000 m2 extension.
Construction of a retention basin to collect surface water run-offs from the tarmac and water used to put out fires at the Findel site.
Modernisation of the train station in Rodange.
Construction of 1,600 parking spaces at the station.
Félix Giorgetti was mandated to carry out major mobility work in Mersch, including the complete renovation of the railway station.
Double the Pont Büchler structure in order to reinforce mobility.
The 72-metre long, 51-metre wide wildlife crossing spans the A3 motorway.
Livingstone 1 is a residence of 131 apartments located in Gasperich, a dynamic district of Luxembourg-City.
Extension of the concrete slab constituting the "P7 tarmac" (parking and circulation areas for Luxair-Cargolux aircraft) over a width of +/- 185 meters. This extension is completed by the deviation of the internal road which requires the realization of a bituminous concrete surface joining the Alpha taxiway and the future extension in concrete paving.
Connection of Boulevard Raiffeisen and route de Kockelscheuer by a 140m long mixed structure bridge.
The City of Luxembourg has entrusted Félix Giorgetti with the construction of the new national soccer and rugby stadium.
In Steinfort, Félix Giorgetti and Kuhn Construction created Champs du Soleil, a new residential neighbourhood.
Félix Giorgetti constructed the 5th extension to the Court of Justice of the European Union.
Design and turnkey construction of Ferrero’s new world headquarters.
Located on route d'Arlon in Luxembourg, the Moonlight building has 9,500m2 of office space.
Construction of a storage hall of 30,000m2 and realization of the external arrangements
For Post Luxembourg, Félix Giorgetti carried out the structural work of its new headquarters.
Construction of a new multimodal terminal for the CFL in Bettembourg/Dudelange on the Eurohub logistics site.
Turnkey construction of a group of administrative buildings totalling 37,000m2 in Kirchberg
In Bettembourg-Dudelange, on the Eurohub site, Félix Giorgetti built a logistics hall of 15,000 m2 for Transalliance.
Félix Giorgetti built a viaduct of 444 metres long by 17 metres wide.
Félix Giorgetti accompanied the accounting firm KPMG from the conception to the completion of its new headquarters in Luxembourg – Kirchberg.
Turnkey design and construction of the new headquarters of Arendt & Medernach in Luxembourg-Kirchberg.
Construction of the “Rengelbur” wildlife overpass as part of the construction of the Route du Nord.
The housing estate includes 72 houses and 2 residences with a total of 30 apartments.
P&T Luxembourg commissioned Félix Giorgetti to conduct the works for its Center/ East Resiliance Center in Betzdorf.
Realisation of a covered section in reinforced concrete 150 meters long.
Sliding of a 20,000-tons tunnel in record time
A new school campus in Mersch in only 36 months.
48 houses in Senningen
1,650m tunnel on Route du Nord
Realisation of the Boulevard J.F. Kennedy in Luxembourg-Kirchberg near Bricherhof.
Turnkey development and construction of the headquarters of Ferrero International and the Grand Ducal Police.
Construction of the Central Gate tunnel as part of the extension of the A4 motorway towards Micheville in France.
The Altena Domain a housing estate is made up of 9 apartment buildings and 18 houses
This 2,966m tunnel is the masterpiece of the Route du Nord.
Construction of the 140 m viaduct for the Lorentzweiler interchange
Ikaros, a highly funtional business centre.
Installation of a 90m bow string bridge over the A6 motorway in only 48 hours.
As part of the construction of the Route du Nord, Félix Giorgetti carried out numerous works including the construction of two viaducts, Glaasbuurgronn and Groussheck.
Félix Giorgetti developed and built, more than 250 luxury apartments.