Cents Gateway
The 200-meter-long pedestrian and bicycle bridge will connect the residential district of Cents to the Kirchberg district. An elevator will complete the connection to the Neudorf district. Our teams began work on the three sites in April 2025
The technical specifications are impressive: the footbridge consists of two main spans, 65 m on the Weimershof side and 135 m on the Cents side. The central pier, rising to a height of around 70 m, will support the structure, while the elevator tower in Neudorf will reach a height of around 60 m. The deck, 6 m wide with a usable width of 4.5 m, will be positioned at a height of approximately 50 m. The difference in height between Weimershof and Cents is approximately 5 m, adding an additional challenge to the assembly of this innovative footbridge
200m
200 m total span
4, 50 m
usable width
70 m
Central pylon
50–53 m
Deck suspended
60–66 m
Panoramic elevator
40.1 million
Total project budget
Projets similaires
CFL new headquarters
2023
A 24,000 m2 building
Ettelbruck One
2023
A 20,000 m2 complex for Landewyck Group
Hosingen cut-and-cover tunnel
2023
The cut-and-cover tunnel is the first section of the Hosingen bypass.
Redesign of the Pontpierre interchange
2023
Redevelopment of the Pontpierre interchange on the A4 to improve traffic flow and safety for local residents.