Execution of works for the Center/ East Resilience Centre in Betzdorf.
P&T Luxembourg commissioned Félix Giorgetti to conduct the works for its Center/ East Resiliance Center in Betzdorf, its fifth datacenter in Luxembourg.
Félix Giorgetti was commissioned by P&T Luxembourg to carry out the earthworks, structural work, the metal frame and the waterproofing of its Betzdorf Datacenter.
This latest generation building offers IT premises of 5,000m2. In order to meet all requirements in terms of security, this new infrastructure was built according to Tier IV security criteria.
In the development of all the building’s infrastructure, particular emphasis was placed on protection of the environment, sustainable development and minimising of climate impact.
The municipality of Betzdorf was also involved in the project and set up three wastewater recovery tanks and 3km of water pipes to ensure optimal cooling of the facilities.
180,000m3
Volume constructed
24,000m2
Surface area
Key Figures
Earthworks
125.000m3
Cast-in-place concrete
26,000m3
Concrete facade
7,500m2
Wall formwork
60,000m2
Self-supporting slabs
19,000m2
Projets similaires
Widening of A3 motorway
2022
Félix Giorgetti is taking part into the major mobility project of the widening of A3 motorway.
lux-Airport maintenance hall
2022
Structural work of the lux-Airport hangar for the maintenance of the Luxair fleet.
PC8
2021
Construction of a 1.9 km bicycle path between Esch-sur-Alzette and Belval, the centrepiece of which is a 1.2 km footbridge, the longest in Europe.
A 400-space P+R in Mersch
2021
Construction of a P+R with 400 places for the CFL next to the station of Mersch to develop the mobility pole of the city.