Projects
Bricherhof Interchange
Category
Interchange at Bricherhof as part of a large-scale construction project.
This large-scale project is located on the Boulevard J.F. Kennedy in Luxembourg-Kirchberg near Bricherhof. The many existing roads remained partially in service throughout the construction period.
This large-scale project is located on the Boulevard J.F. Kennedy in Luxembourg-Kirchberg near Bricherhof. It is located among many existing roads that remained partially in service throughout the construction period.
Multi-phase execution was necessary for the following work:
- removal and reconstruction of the sewage system;
- construction of two roundabouts;
- demolition of three existing structures;
- construction of temporary pavements along Boulevard Kennedy;
- construction in stages of an underpass below Boulevard Kennedy (structure on piles);
- construction of the new Boulevard Kennedy (in stages);
- installation of new networks throughout the area;
- phased connection of adjacent streets;
- large walls along new roads, either in gabions or concrete walls faced with natural stone.
± 100,000m3
Backfill of excavated soil
± 41,000m3
Excavated soil
± 50,000m3
Trenches
Key Figures
Backfill
180,000m²
Waste water drains
4,000rm
Drain pipes
10,000rm
Visible faces in natural stone
2,500m2
Formwork
± 6,700m2
Reinforcement
± 300,000kg
Concrete
± 2,300m3
Installation of borders
± 8,245m
Slag gravel
± 11,000t
Asphalt
± 10,400t
Projets similaires
New railway line Bettembourg-Luxembourg
2023
Construction of a 1.7km section of the new railway line between Bettembourg and the capital.
Widening of A3 motorway
2022
Félix Giorgetti is taking part into the major mobility project of the widening of A3 motorway.
Höhenhof boulevard
2022
Making of a cut-and-cover tunnel and of a part of the new Höhenhof boulevard as part of the tram's arrival at the Findel.
PC8
2021
Construction of a 1.9 km bicycle path between Esch-sur-Alzette and Belval, the centrepiece of which is a 1.2 km footbridge, the longest in Europe.