In Moutfort, a new underpass for vehicles and an underground passageway for pedestrians are replacing level crossing No. 59. This marks a new step forward in improving safety at road-rail crossings.
The project to remove level crossing No. 59 is part of a CFL initiative to replace road-rail intersections in order to improve safety and ease traffic flow. In Moutfort, our teams have begun work on two separate structures: a road underpass for motorists, allowing vehicles to pass under the tracks without stopping or maneuvering, and, nearby, an underground passageway for pedestrians, providing them with a convenient route that will make it easier to cross from the Ledenbierg neighborhood to Rue du Chemin de Fer. The road layout will be adapted over a length of approximately 200 m.
A carefully planned construction site
The phasing of the work, which will take a total of 350 days, has been designed to preserve the continuity of local life. The first preparatory work involved monitoring the tracks and shoring using triaxial sensors, supporting the prefabrication pits with Berlin walls, and diverting the CFL networks.
In order to ensure the continuity of rail transport and limit the impact of the work on traffic, the two reinforced concrete structures that will form the future crossings were prefabricated on site.
200 m
road length
12 m wide
15 m long
8 m high
internal passage size
3,75 m wide
9 m long
3,80 m high
underpass size
Projets similaires
Hosingen cut-and-cover tunnel
2023
The cut-and-cover tunnel is the first section of the Hosingen bypass.
Dippach-Gare bypass
2023
Construction of a 2.2 km bypass to relieve traffic congestion on the rue des Trois Cantons.
Redesign of the Pontpierre interchange
2023
Redevelopment of the Pontpierre interchange on the A4 to improve traffic flow and safety for local residents.
Biological wastewater treatment plant
2024
Modernisation of the Sidest wastewater treatment plant at Uebersyren